Nuvolt — energy solutions
Case study · Global Vacuum & Abatement Solutions

Edwards Vacuum

Half-megawatt rooftop solar woven into a live, high-specification industrial manufacturing site.

System size
512 kWp
Year-1 savings
£71,177
Payback
5 years
All case studies
Client
Edwards Vacuum
Sector
Global Vacuum & Abatement Solutions
System size
512 kWp
Solutions
01The problem

High energy demand was creating a growing operational cost burden.

As a major manufacturing facility, Edwards Vacuum operates energy-intensive processes that require a reliable and cost-effective electricity supply. Rising energy costs presented an opportunity to reduce operating expenditure while supporting wider sustainability objectives.

Edwards Vacuum site context
Edwards Vacuum installation
02The solution

Infrastructure designed around how the site actually consumes energy.

Nuvolt assessed the site's energy profile and designed a 512 kWp rooftop solar PV system aligned with operational demand. The solution was integrated alongside wider building services infrastructure and engineered to maximise on-site generation while supporting long-term performance.

  • Reduced grid dependency, lowering operational carbon emissions
  • Improved energy cost control, reducing exposure to wholesale volatility
  • Installation delivered within a live manufacturing facility with no operational disruption
  • Ongoing performance oversight protecting yield and long-term return
03 · The outcome

More than £71,000 in projected annual savings.

The completed system provides Edwards Vacuum with a significant source of on-site renewable generation, reducing reliance on imported electricity and creating long-term cost certainty. The project is forecast to deliver annual savings exceeding £71,000 with a projected payback period of approximately five years.

System size
512 kWp
Year-1 savings
£71,177
Payback
5 years
CO₂ saved
50.98 T
Proof in delivery

Selected projects

All case studies →
Take the next step

Ready to model your numbers?

Five quick questions and our team will come back with a tailored proposal — CAPEX, finance, PPA or fully funded.