Case study · Public Sector

Frenchay Primary School

Rooftop solar PV and full M&E re-instatement for a primary school estate — cutting bills, supporting the local council's net-zero plan and creating a live teaching aid.

System size
53.1 kWp
Industry
Education
Scope
Solar + M&E re-instatement
All case studies
Client
Frenchay Primary School
Sector
Public Sector
System size
53.1 kWp
Solutions
01The problem

Delivering renewable energy within a highly sustainable education facility

Frenchay Primary School was developed as one of South Gloucestershire's first Passivhaus-standard schools, designed to achieve exceptional energy performance and support long-term carbon reduction objectives. The challenge was integrating renewable energy generation within a complex new-build educational environment while ensuring all supporting mechanical and electrical infrastructure performed as a single, coordinated system.

02The solution

Solar PV integrated with wider building services infrastructure

Nuvolt delivered the rooftop solar PV installation alongside the reinstatement and integration of associated mechanical and electrical systems. Working as part of the wider project team, the solution was designed to support the building's low-carbon objectives while ensuring the renewable energy infrastructure operated effectively within the school's broader energy strategy.

  • 53.1 kWp rooftop solar PV designed for a working primary school
  • Full Mechanical and Electrical re-instatement delivered alongside the solar
  • Retrofit engineered to fit the existing building structure
  • Supports the local council's net-zero plan and doubles as a live teaching aid
03 · The outcome

Supporting a low-carbon learning environment

The completed project contributes renewable electricity generation to one of the region's most energy-efficient educational facilities. By combining solar generation with integrated building services infrastructure, the project supports lower operational energy demand, reduced carbon emissions and a more sustainable long-term energy model for the school.

System size
53.1 kWp
Industry
Education
Scope
Solar + M&E re-instatement
Proof in delivery

Selected projects

All case studies →
Take the next step

Ready to model your numbers?

Five quick questions and our team will come back with a tailored proposal — CAPEX, finance, PPA or fully funded.